10 months inspection tomorrow.

Our 10 month inspection is scheduled at 11 a.m. tomorrow. We haven't heard any feedback to the check list that we had sent to Ryan Homes.  As our list is very small, it should be taken care of in couple of days time.

Update to my last post : The common area on the left to the house has been sodded. And we even have 4 pretty red maple trees on the border of our lot and the common area. It all looks pretty now.

About the Poison Ivy patch at the back of our lot, I think we have to lodge a formal complaint to the HOA as we didn't hear anything from the developer and he is about to handover the community over to the HOA.

Newly sodded common area. I don't have the "before picture", but there was nothing but rocks and was a barren land.


Thursday, October 11, 2012

10 Months inspection in Oct. last week.

We received the letter from Ryan Homes stating that our 10 month inspection is going to be in the last week of October. It's been almost 2 weeks since we got the letter and my punch list is not ready yet. We have to send this list to RH ASAP now.

       Speaking of the list, we have two major issues to tackle and both of them are regarding landscaping.  I am not sure if it should be included in the 10 month inspection list or not. But then again, this will be our last chance to get it settled before the developer hand overs everything to the HOA by te end of this month.
    Our lot shares the boundary line with common area from two sides. Left side of the house and of course from the backyard side. We have a thicket adjacent to our backyard. Thorny bushes and it's thorns always creeps up on our backyard. And it makes mowing very difficult from that side. but that's not half the problem. My main issue is the Poison Ivy that's thriving in the thicket. And every now and then it creeps up on our land. And hubby has to take care of it. Last month while doing the same thing, despite of wearing gloves, he came into contact with poison ivy somewhere near his elbow. Long story short, one ER visit....one week of steroid treatment for severe poison ivy rash.... not to mention the throbbing pain in this entire arm for 10 days. So coming to the point, we requested our developer to come up with some kind of solution for this. I think if they clear the thicket for at least a foot or two from our lot, it will give us some relief form these issues. Please let me know any other possible solution for this problem. TIA.
              The developer emailed us back saying he is going to send his landscaper this week to review the situation. 
     Other point is also regarding the adjacent common area on the left side of our house. we were told early in the building process that the area  is going to be sodded along with some tree planting by the Sept. end. Nothing has been done in that huge empty area and there is nothing but rocks and weeds. It's been such an eyesore for us for 10 months now. Ryan Homes developer is going to hand over our community to HOA soon and I want to tackle these two issues before that happens, so that I don't have to deal with the HOA later. Again the developer's reply is that they are going to sod the area soon and he is looking if he can arrange and plant a tree or two in there.
        If any of you think that these are not the points that I should be including in our 10 month list, let me know as well.

Other than that very few # of items to go on the list that are from inside the house.
Creaking floors in family room and master bedroom, loose floorboard, nails pops, a few cracks.

I will certainly keep you posted on these matters.

UPDATE :  The common area on the left side of our house has been sodded this afternoon, just 2 hrs after this post.
Still waiting for the developer to come up with some kind of solution for the thicket problem. 



Monday, May 14, 2012

Life in our new Rome.

 After closing and shifting was done, I was anxious as to how are my DD(s) were going to adjust in new school with new friends. But thankfully on that  front everything went smoothly. They made quite a few good friends in the neighborhood and in the school.

   We had very few issues for our three weeks inspection.  Small issues (like powder room mirror was loose, kitchen island support was loose, minor imperfections in color.) were taken care of asap.

The only thing that took time (3 weeks.) was Trinity security alarm. Because of faulty wiring, alarm wasn't working. It took several phone calls to Trinity before they fixed that.. But they had provided a temporary alarm in the basement till then.

There was a noticeable dent on cooking range. PM ordered that part and changed it at the time of three week inspection.
  
Other than that we are thoroughly enjoying our new house. And look who showed up in our backyard  on a sunny hot day !
Eastern Box turtle.



So far we have enough furniture that's necessary. Five, out of eight ceiling fans are up and running. We have installed pendant lights over the kitchen island.  And now here comes few snaps.

Living room.

Family Room. 

Family Room.
Dining Room.
Kitchen
Temporary set up till we get nice furniture for the morning room.. Right now it's all mish mash of fabric, leather and metal.

Basement.
Loft furniture.
Ceiling fan in the loft.
DD's room ceiling fan.

Sunday, January 22, 2012

Ghosts from the past?

Well friends .. It was a toilet issue. Just after 2 days of use our powder room toilet began to clog. Trying plunger N stuff  didn't work. Thank god it didn't overflow. But we were scared to use upstairs bathrooms too. 
      When the plumber came the next day he tried to flush whatever it was. He started to flush from upstairs bathroom and had to use the hose that went all the way up to the basement plumbing before it could reach  the blockage. It was something hard like concrete or stone etc.  So long story short, his guess was something might have fell down in the plumbing pipes in the construction process. And then I remembered that after our plumbing was done those pipes in the basement was not covered with plastic plates for like a week or so.  That time I had to remind our PM to covet it asap. 
         After this my ever restless soul  was still not sure that everything is alright. So we did the snake plumbing sewer camera inspection. And it didn't show anything in the pipes this time.
    All is well now !! 

   

Tuesday, January 10, 2012

Life after closing !!!

It's been 12 days since we close. Closing was like a walk in a park. Went very smoothly.
And after closing life is crazy busy. It's funny but I am missing the days before closing when I used to come and take a look at the progress N stuff. But now since I am actually living under the roof, life is crazy busy. But I am loving every minute of it.  My daughters are the happy as they finally got their own rooms.  So here is a quick recap of the things got done since closing.

We closed on 29th as scheduled.  Some minor things (  paint touch up, rough spots on steps handrail etc) that our independent home inspector pointed before final walk through with PM , were  taken care of before we came back with THE keys.

Movers came on 3rd January.

Lowes installed the blinds. We chose Levelor in white and Levolor custom top down/ bottom up  blinds on some windows.

Verizon Fios services are up and running.

Trinity wiring crew came and activated the service. The security alarm on the upper level is  not working and there is a possibility of faulty wiring. So the trinity electrician is scheduled for tomorrow.

Washer dryer from Best Buy  and new mattress got delivered.

As for me... I was busy prepping the bathrooms and kitchen.  Sealed grouts in morning room and kitchen. Sealed all the granite. After a week of eating outside and carry outs I finally started cooking since yesterday. Lucky me as my brother and his wife lives close by so we could go there even unannounced at times for quick snack breaks and even for lunch or dinner.  I was able to pack the boxes much more quickly as daughters were staying with them for couple of days.

Girls are making new friends in new school and getting used to school bus timings.

In the decoration department, nothing has been done yet except some beautiful vases on  fireplace. We are overwhelmed with our home and not sure which project we should do first. Very hard to prioritise as I want everything and want it ASAP.  I will start with pendant lights over kitchen island and at least two ( out of 7 in all ) ceiling fans. And will leave major projects like painting the whole house for later, although I am getting very tempted  after reading all the blog entries about painting.

Sunrise from morning room. Isn't it beautiful !

From masters bedroom.

From side window of masters bedroom. 

First snow of the season in our backyard.







Thursday, December 22, 2011

Wrong.. Again..

     Last week they messed up  installing the wrong carpet pad on all levels. But thanks to our super PM that issue got resolve in no time.

    Well this time it's our front door! They have painted front door in Wine Tone color, matching it to our shutters when it's suppose to be black. While Wine tone color is also not looking that bad., we decided to go for black. So hubby is going to email our PM and I am sure this will be taken care of.

Our selections. Wine Tone shutters with black door .
It was dark when I clicked this snap. That's why it looks  black. But it's actually Wine tone color like the shutters.

Thursday, December 15, 2011

Update on carpet pad issue.

So today we had a meeting with our PM. It was nice of him to meet us on such a short notice.  He said it was a honest mistake on their side. And the problem has been fixed. So now we have the correct carpet pad underneath the correct carpet. They did remove the upgraded pad in family room though. I know for sure the tine thought will remain in my mind as to what would have happened if we had not gone there at the right  time. Ah well.. !!

   We also discussed about some small concerns that we had. And PM assured us that it will be all taken care of before our walk through on 27th December. Small concerns like shelves in master closets at wrong height, no siding on small part of exterior, minor imperfections in kitchen cabinets etc.
     While we were there, they were prepping our driveway to pour the asphalt. Today I couldn't take any photos. But I am planning to go there early tomorrow. So I will have lots of snaps to show. A lot has been done in the last week. All light fixtures( incl. boobilier..:), masters bathroom and kids bathroom ceramic tiles with accent tiles, hardwood in dining room and living room, carpet, granite, ceramic tiles in kitchen and morning room.... !!! Everything !!! More on that and lots of snaps coming tomorrow.

Ughrrrr......

Just when I thought and surely was keeping my fingures crossed that there is not going to be any "lashing out" post in my blog.!! Everything was going smoothly. In fact I have "LOVE IT " post saved on the blog ready to be published. But..

   Coming straight to the point. Yesterday evening  we went to our new home. The carpet crew of four was just finishing the carpet installation in the family room and study. Upper level carpet was almost done. And one worker was busy putting the pad on the steps. After may be half an hour or so when we went into the basement one worker was installing the carpet. and just one small area of the pad underneath was still showing. I immediately noticed that something is off and I was right. They had installed the wrong carpet pad in the basement. We have upgraded the carpet pad in the basement to  level C and they were putting the standard level A pad.  I asked  him to stop working until I clear this but he finished the rest of the carpet anyway. So as of today we have wrong carpet pad in the basement. Then obviously we asked the worker to show us which pad they had put under the family room carpet. Turned out that there we have level C carpet instead of level A. We had upgraded famly room carpet to level C. So now we have upgraded level C pad with level C carpet in family and study.  @#$%$#@ !!!?
                 We contacted our PM and got his reply back that he dosen't have our carpet pad selections with him. We are going to meet him in the afternoon. I am sure he will solve this problem. But the scary and frustrating part is if we had not gone there in time before the carpet installation, there is a good possibility that this would have gone unnoticed.  And now in todays meeting if they decide to rip off all the carpet in the family room and study to correct their mistake which shouln't have happened in the first place, .... BOY I am going to so MAD!!!!

I am truly sorry guys for me venting out like this, but it's frustrating. Thanks for understanding. Now I can go and meet the PM with a little bit cool temper.  I will update you all about todays meeting as soon as possible. We also have other small issues to discuss with PM.

Thursday, December 8, 2011

Cabinets, paint, siding .....

Last week we made a good amount of progress. Our cabinets are installed.  I noticed that the cabinet installation is done a bit poorly.  Some cabinets are not aligned properly. Small area near the sink is damaged a bit. Few knobs are missing. But these are very obvious things to notice. So I am sure PM will catch them in no time and it will get fixed.  Not worried about it. One thing I was wondering about and didn't get time to check with our PM yet, is do we get electrical outlet(s) on the island. I remember vaguely asking about this to our SR. And I THINK we should have it.

   On Tuesday our siding guy was finishing our siding job. I am loving the Sandy Tan color. So one less thing to guess as to am I going to love it or am I going to strangle myself for making a bad selection? Our Sandy Tan siding is looking  beautiful and just what I was expecting it to look.. Also stone is ready to go up. And I am hoping to see my whole house exterior done in my today's trip to our house.

 Our fireplace, railing, doors are  in. And  the first coat of paint making the house look like the house. I am glad that the color is not stark white but has a beige shade to it. And I think I can live with it until we paint after 10 months inspection.

    
There are some things that I have to check in my today's trip.

1. Drywall installers covered one of the recessed light in the  family room. Gotta check if it's been excavated.yet.
2. Improvements in kitchen cabinet installation.
3. Electric outlet point under kitchen island.
4. Not sure why but small insulated area near bathtub in master bath is not covered with drywall. See the snap below.

   5. Also wanted to check about one electric point on the right side of the fireplace. Not sure if that should be there. or should there be another one on the left side too.  You can see it in the fireplace pic above.
 
will update on these issues. Until then have a good and  warm day !!

Sunday, November 27, 2011

We have walls !!!

I hope this thanksgiving weekend was filled with joy and laughter for all in my RH blogger family.

There was almost no activity on our new house after insulation. Our drywall was delivered , ready to be hanged. Finally on Wednesday (23 Nov.) around 3 pm when we went there we saw 3-4 workers hanging the drywall up.  Looked like they had just started the work. It was quite cold and windy that way and so we got them some coffee and doughnuts.
      We were sure that we will not see our dry wall all up and hanged until Monday or even Tuesday because of thanksgiving. We had Thanksgiving lunch at one of our friend's place who lives very close to our soon to be new home. So needless to say, after the lunch we headed to our new house and very much surprised to see a whole bunch of workers were finishing the drywall task on Thanksgiving day!!!! They were almost done and were cleaning the floors and preparing propane tank and heater for drying up the walls. Thank you guys !!!!

         Couldn't take any photos that day. But today was a perfect day to hang out at our new house. The weather was perfect. So we cut short our dog Taz's  play time in dog park and went to the new house. So here are some of the snaps.

Walkout basement.

View of the front door. Living room and dining room on the left. Mud room and stairs to upper level on the right. 

Kitchen. Morning room on the left.

Family room from kitchen. Morning room on lower right corner. Study is on the far left corner of the photo.
Living room and dining room.
Morning room.
Kitchen from morning room. Panrty door on the left.
Loft. Upper level. 
Sitting area in master's bedroom and closet entrance. 
  Our Sandy Tan siding, winetone colored shutters and susquehanna stone are ready. Can't wait to see how everything will look.

Tuesday, November 22, 2011

Pre-drywall meeting and other updates

We had our pre-drywall meeting on 17th Nov. Before the meeting we did our independent home inspection. The home inspector did not find anything major.Just some minor points like missing caulking and bowed studs in 3-4 places.Our home inspector was impressed with the quality of work done. One point he raised was that there is no incoming plumbing in the basement bathroom 3 piece rough in. Later in the pre-drywall meeting, our PM explained that this is how it is. Ryan does not provide incoming plumbing, just the 3 piece rough in.

Other than that, meeting went great and we got out closing date. DRUMROLL PLEASE !!!! It's 29th Dec !!.Yay !!!!

Today the workers finished insulation job. We passed all the inspections (mechanical, plumbing, wiring and building). Our drywall is delivered, drywall installation will take place tomorrow, our exterior susquehanna coblestone is also here. So I am guessing we will have our exterior done by end of this week. Yay for everything !!!


Monday, November 14, 2011

Pre Drywall meeting on Thursday, 17 November.

 We have finalized our pre drywall meeting on November 17 in the afternoon. And in the morning we are taking our own home inspector to do the inspection. I have my own list of questions/concerns to ask to our home inspector and to the PM. That's why we have kept whopping 5 hrs of time margin between inspection and pre drywall meeting.  It's going to be a busy day!! But I hope everything will go smoothly.  Will post the details of our pre drywall meeting for sure.

This morning we had a meeting with Trinity Rep. at out lot to finalize the locations for duel ports, keypads, motion detectors etc etc. It went for about an hour.

So in all lot of action is going on in the house.
  • The HVAC system is in  it's place. 
  • Plumbing crew was working on rest of the plumbing. So plumbing will be finished by the end of the day. 
  • Trinity wiring crew is going to finish their job today itself. 
  • Electrical wiring will get done may be tomorrow. (?)
  • our garage door got installed on Friday. 
  • Bath tubs and shower pan is installed in the bathrooms. 
We have garage door !!

Add caption
 Can't wait to get (tentative) official closing date after the pre drywall meeting. And can't wait to lock the rate. Keeping my fingers crossed and hope high on getting the interest rate below 4 % 
Almost can't believe how time flies. It feels like yesterday that we signed the contract and now we are already talking rate locking...  and closing.... and furniture.... and future projects... !!
I can surely say that I am absolutely enjoying the home building process  although I have my anxiety attacks from time to time as to how our house is going to turn out ? But yes we ARE having the time of our lives !!!!

Thursday, November 10, 2011

Just a thought !!

We are getting gourmet kitchen which includes all stainless steel appliances. I am not too crazy about the ones that Ryan is providing. But thought that I can always change it later after may be couple of years. But while going through the black Friday ads, a thought  came through my mind. Is it too late to opt out and not getting the fridge from Ryan? If Ryan can give us the credit for the fridge, we can use it towards something else and I can choose and buy a refrigerator of my choice.  At which stage does Ryan order the appliances? has anybody done this before at this stage the construction process? 

  We are expecting to close in early January. I would like to take advantage of the holiday season sales.  And my ever extending list of things to buy is scaring my hubby. :)  I always knew, I am not good  in VED analysis !!
 

Wednesday, November 9, 2011

PIECE BY PIECE !!

Our house is coming together piece by piece. Here are some things that got done yesterday and today.
All windows, french door in morning room, basement siding door installed. 
Shingles installed.
Our fireplace is in it's place. 
Today bathtubs, shower pan and water heater arrived. May be it will get installed tomorrow.
Our HVAC and  plumbing material is also there in the living room ready to get installed.  HVAC installation will get completed in this week.
Roof, garage trim and front door decorative trim. 

Beautiful fall foliage. Snap taken from master bedroom window
Picture taken from master's bedroom. Since we have walkout basement, our upper level is more higher from the ground than I have imagined. Can't wait till they clear the lot.

I have one small confusion. While in framing stage, I noticed in the garage near ceiling there was a gap of about a foot or so between two wooden blocks. (as if they ran out of wood.) Only on the left side. The next day I noticed that the worker had stuffed some sponge like material in that gap and then nailed wood piece over it. It will be more clear from the snaps below. Is this normal? Or is there a better way to do this?


Sponge like material.

Spongy material covered with wood.

We are hoping to have the pre drywall meeting next week.  Will clarify this with PM and our home inspector. 
 





Monday, November 7, 2011

We are making great progress!!!

A lot has been done in the last week. I am so excited as the house we were dreaming of is becoming the reality. And day by day we are getting closer to our dream.
    We have almost completed the framing process. This week we will have our electrical wiring done. And hopefully our predrywall meeting will be in the next week.  We have already made an appointment with our home inspector for the inspection before our predrywall meeting.

Here is our progress step by step. 
Framing starts !!!        
Walk out basement and morning room framing. 
Morning room.
Kitchen. Morning room on the left.
All wrapped up!!
From the side.
Back view. Walkout basement, morning room and upper level.
Side view. Morning room windows on the right.
 
 I took some snaps of  things that looked  kinda unfinished. Small things here and there. This might not be anything and PM will notice them before inspection. I will make a separate post for those things.